Enfield Cycling Campaign

The discussion group for Enfield Cycling Campaign

  • South East Herts Growth and Transport Plan

    Created by JonC // 1 thread

    The South East Hertfordshire Growth & Transport Plan (SEGTP) is a new transport strategy to help direct and plan transport improvements and investment in Hertford, Ware, Hoddesdon, Broxbourne, Cheshunt and Waltham Cross, and to surrounding areas.

    This area faces significant levels of proposed new housing and employment development, with added pressure of new homes and jobs are also proposed in surrounding areas including Cambridgeshire, Essex, Greater London and the rest of Hertfordshire.

    Important transport links in this area include the M25, A10, A414, A119, B1197 and A1170 roads, the West Anglia Main Line railway line, the National Cycle Route 61 and a range of local and longer distance bus and coach services.

    To help ensure the transport network continues to work safely and efficiently, the GTP identifies packages of interventions, that could address current and future traffic congestion issues such as noise and poor air quality. Interventions can be small or large, and could be introduced now or in the future, depending on how complex they are and if enough funding is available.

    Please sign in to vote.
  • A1000 pop-up cycle lanes south of Tally Ho gyratory

    Created by JonC // 1 thread

    Following Dft Phase 1 funding arising from the current Covid19 situation, designs are available for cycle lanes covering the approximate 3.2km length from the Haringey boundary to just south of North Finchley.

     The design principle has been, where possible, to provide a temporary lightly segregated cycle lane, defined by wands, bolted into the carriageway surface at 4m spacings. In some cases, we have taken a cycle lane width of 2.5m. In other locations, where space permits, we have re-allocated the whole of a current running lane.

     At other locations, we have needed to retain a ‘with traffic’ cycle route. In order to mitigate this, these sections of the route will be provided with carriageway cycle markings and signage as is usual, but complemented with the introduction of 20mph limits.

     Monitoring of the route will take place (and indeed has already started) to assess cycle and motorised traffic volumes, as well as to assess any changes to the temporary layout that may be necessary.

     In developing the design we have engaged with TfL’s cycling sponsors and have incorporated, where applicable, comments and suggestions from their design audit teams and our safety advisors. We have also obtained support from the police in respect of the 20mph limits.

    Please sign in to vote.
  • Please sign in to vote.
  • Barnet Draft Long Term Transport Strategy 2020-2041 Consultation

    Created by JonC // 1 thread

    Update: Strategy adopted by Environment Committee on 09/09/2020

    "Barnet’s population is growing and by 2030 it will have grown to almost 450,000 people, with a significant increase in the older population. We want to ensure that transport in the borough can support this growth and provides a reliable, safe and convenient transport network which supports improvements to air quality and the health of all of our residents."

    "There is also limited road space in the borough and with the projected population growth, congestion can only be addressed by reducing our reliance on the car and encouraging more sustainable and active ways to travel such as walking, cycling and public transport."

    "Our proposed Long Term Transport Strategy sets a direction for change to offer greater choices for travel, encourage more active lifestyles which will increase the health and well-being of Barnet’s residents and improve air quality. The strategy also sets out a number of proposed schemes for each type of travel along with activities to help change behaviour and encourage positive changes to the way we currently travel."

    "

    Our vision

    The strategy includes the following vision statement relating to our long term vision for transport in the borough:

    By 2041, Barnet will have an efficient, convenient and reliable transport network, which enables safe, healthy and inclusive travel, protects the natural environment and supports the borough’s growth.

    The network will have transformed the way people and goods travel, providing strong orbital and radial links which gives everyone a choice of transport modes to complete their journey regardless of age, ability or income.

    This vision informs our proposals for the future of transport in the borough, and sets out a roadmap for achieving our vision which also complements other council policies such as the Growth Strategy(External link), the Joint Health and Wellbeing Strategy(External link), and the draft Local Plan(External link)."

     online questionnaire(External link).

    Please sign in to vote.
  • Highway Code changes

    sound+fury // 1 thread

    A bill is being put forward to sentence any cyclist convicted of dangerous cycling to a 14 year prison term.

    Please sign in to vote.
  • Barnet Cycleway between Hornsey and North Finchley

    Created by Simon Munk // 1 thread

    Barnet council says...

    Overview

    You and others in your area have a unique opportunity to benefit from Transport for London (TfL) funding to improve walking and cycling routes between Hornsey and North Finchley.

    We want to hear your views on our proposals that will transform streets in the borough. The improvements will help provide a future Cycleway between Alexandra Park in The London Borough of Haringey, through quiet streets and over the North Circular into The London Borough of Barnet; ending at North Finchley High Road A1000 amongst a busy parade of shops and cafes.

    Background

    The proposals are an important part of the Mayor of London Transport Strategy and Barnet’s ambition to get more people to walk and cycle. The proposals are guided by the Healthy Streets Approach(External link) which aims to encourage walking, cycling and public transport and make London greener, healthier and more pleasant.

    We have commissioned Sustrans Ltd(External link) as project coordinator and delivery partner for the Barnet section of the Cycleway route from Hornsey to North Finchley.

    Over the last two years Sustrans, in partnership with the council, engaged with residents in specific areas along the route to better understand local travel choices and concerns, road traffic and the quality of local streets.

    The proposals we are consulting on aim to address these issues, ensuring that improvements help to create an environment in which traffic is both reduced and slowed, and in which air quality is improved.

    What are we seeking your views on?

    This consultation is asking for your views on the draft concept designs for the route.

    Specifically, we are seeking your views on:

    • the layout of proposed street alterations within the draft concept designs
    • any comments you may have on the overall draft route.

    For more information on our proposals please read our FAQ document.

    Please sign in to vote.
  • Cockfosters station major development

    Created by JonC // 1 thread

    NO MENTION OF IMPROVED BUS, PEDESTRIAN OR CYCLE ACCESS.

    TfL and Grainger plc are working in partnership to prepare plans for a residential development at the Cockfosters station car park site.

    - Utilise brownfield, public sector land to help deliver around 400 new private and affordable homes for rent;
    - Preserve and enhance the setting of the Grade II listed London Underground station;
    - Through quality design, create a positive relationship between any new development and Trent Park Conservation Area and
    Grade II listed park and gardens which form part of the Greenbelt;
    - To create new public and private spaces and improve the access point to the London Loop trail and Trent Park;
    - To encourage a shift to more sustainable modes of public transport and reduce the need to travel by car in the local area; and
    - To deliver a car-free development, with the exception of disabled car parking for both station users and new residents.

    An initial public event was held on 18th June. A detailed public exhibition is due autumn 2019 followed by a detailed planning application.

    Feedback can be provide via the following link.

    Please sign in to vote.
Back to top